top of page
home renovation
Outdoors remodeling
Before

Tailor Made Pergola
Outdoor paved terrasse
Installation of wooden fences
Warm shade color paint for the exterior walls
Before





After

Bathrooms renovation

Before


Complete reconfiguration and renovation of the master bathroom

After

Before


After

After
Complete reconfiguration of the Guest Bathroom

Before

Build-in bathroom shelf


After
Complete Master Bathroom reconfiguration -
We have kept the gorgeous handmade pink marble double sink to bring a unique and authentic touch to our contemporain design.
Kitchen renovation

Before


After
Entrance
After
Before
.jpg)

We have selected a white paint for the ceiling,
a warm white paint for the walls and a grey-blue tone for all the doors and wooden frames to bring light and provide warmth to the 3 meters long corridor.
bottom of page